Future Projects
Paving estimate for Pueblo Blvd, Xanadu Ave, and 168th St. W
Crack fill work on Jordan Ave, Greystone Ln, Avalong Trail, 173rd St. W (both sides of TH 169)
Seal coat work on Golfview Dr, Ridges Dr, Ridgeview Circle, and Golfview Circle
Culvert repair on Naylor Ave
Right-of-way tree trimming
More permanent frostboil mitigation projects
Continue to use Pollinator Grass Seed mixture on re-seeding projects with the road right-of-ways
Continue to work with residents on driveways that dump water out onto the roadways
Mill and overlay Sand Creek Drive and Twin Oak Circle: